What's broken right now
2 effects dark across the park-
Harry Potter and the Forbidden JourneySecond dementor is not moving
⚠ status unknown — still down?41days dark -
The Cat in the HatWater feature on the marquee sign outside the attraction is broken.
⚠ status unknown — still down?33days dark
Crowd-reported & dated — we keep the record, not the live status. Tap a ride for its full Known Issues board.
Croissant Moon Bakery exterior refurbishment complete; facade repainted from brighter orange-yellow to muted yellow. — Croissant Moon Bakery
Construction walls shift around Mythos Restaurant and former Poseidon's Fury as Lost Continent demolition continues; Mythos to permanently close next year. — The Lost Continent
Construction walls up for a new water fountain to the right of the "Q is for Quan!" restrooms in Seuss Landing. — Seuss Landing
Half of The Lost Continent demolished; Sindbad stunt show theater, Mystic Fountain, and Poseidon's trident removed. — The Lost Continent
Cool Zone fan added to Port of Entry near Marvel Super Hero Island bridge. — Port of Entry
Roof refurbishment underway at Jurassic Park River Adventure; old roofing stripped, black sheathing exposed during 11-month closure. — Jurassic Park River Adventure
Guest-operated water cannons removed from the attraction. — Popeye & Bluto's Bilge-Rat Barges
Construction walls and scrim now cover the jailbreak scene facade in Port of Entry. — Port of Entry
Former will call pavilion outside Islands of Adventure converted to cool zone with seating, fans, and water vending machine. — Will Call Pavilion
Poseidon's Fury Trident demolished as part of ongoing Lost Continent demolition since November 2025. — Poseidon's Fury
That's every change on the record at Islands of Adventure since 2026.
The spotters in our Discord catch the next one first — and the record only grows when someone notices.